C O M P O S I T E S V C I

CASE STUDY

Optimizing the Production of a Client Product Using Lean Manufacturing

About the Project

Project date:

2025

Industry:

Recreational

Processes used:

LRTM


Challenges

Triple the daily production output of a client's product consisting of several varied parts.

  • Identify new bottlenecks caused by tripled production
  • Maintain production within the same allocated floor space
  • Implement changes within 3 months without compromising committed deliverables to the client
  • Recruit and train several new employees

Internal Process Optimization

Lean Manufacturing

Organization and Flow

Implement 5S to improve workstation organization and analyze bottlenecks to optimize production flow.


Performance Management

We introduced visual management tools for critical production information and implemented daily KPI tracking to monitor performance.


Waste Reduction

We reviewed manufacturing methods to eliminate non-value-added activities and used Pareto analysis to identify the primary causes of defects and reduce non-quality


Results

Through Lean manufacturing tools, daily production was successfully tripled in less than three months.

5S Implementation Enabled:

  • Optimization of the floor space used by each workstation
  • Use of freed-up space to double the number of workstations at critical stages
  • Reduced travel distances and improved workspace efficiency

Production flow analysis enabled:

  • Implementation of a circular production flow, offering the ability to centralize fixed production equipment and allow access from all workstations

Visual management implementation enabled:

  • Facilitating communication and information sharing across production teams
  • Improving workstations to facilitate and accelerate the onboarding of new employees

KPI Tracking and Pareto Analysis Enabled:

  • More proactive management on performance gaps

Manufacturing Method Improvements Enabled:

  • Elimination of multiple sources of waste and reduction of cycle times
  • Earlier detection of quality issues
  • 50% increase in first-pass yield




On-time deliveries
 

100%

Improvement in First-Production Conformance Rate
 

50%